Profile cover photo
You're now following
Error following user.
This user does not allow users to follow them.
You are already following this user.
Your membership plan only allows 0 follows. Upgrade here.
Successfully unfollowed
Error unfollowing user.
You have successfully recommended
Error recommending user.
Something went wrong. Please refresh the page and try again.
Email successfully verified.
User Avatar
$30 USD / hour
Flag of EGYPT
giza, egypt
$30 USD / hour
It's currently 9:08 PM here
Joined December 24, 2018
0 Recommendations

Mahmoud A.

@mahmoudadel33

0.0 (0 reviews)
0.0
0.0
0%
0%
$30 USD / hour
Flag of EGYPT
giza, egypt
$30 USD / hour
N/A
Jobs Completed
N/A
On Budget
N/A
On Time
N/A
Repeat Hire Rate

Structural Design Engineer

Structural Design Engineer-Concrete Structures ELSEWEDY ELECTRIC POWER SYSTEM PROJECTS Aug 2019 - Present (4 yr) Project: Julius Nyerere Hydropower Dam (JNHPP) Location of project : Tanzania Location of work : Tanzania , Dar es salaam , SMEC Offices . (2 yr and 6 mo ) Tanzania (Selous Site). (1 month) Cairo. (1 yr and 4 mo ) Duties: • Making structural Design for Erection Bay in Powerhouse Building. • Making structural BOQ for main hall units in the powerhouse building. • Making Structural Design for control building. • Making structural BOQ for control building. • Review the stability report and GDR report for powerhouse building. • Coordinate the structural drawing with other disciplines and make contact between dar es salaam and cairo team with site team. • Making structural design for auxiliary building in powerhouse building. • Making Structural Design For walkway. • Review 3d model of powerhouse related to construction drawing. • Coordinate the structural drawings for units no 1,4,5,8 with other disciplines and solve the clashes. • Track SMEC drafters on daily basis and send the comments to them to improve the quality of the drawings. • Coordinating the Artelia Comments reviews and share it with SMEC. Engineering programs used: Autocad, Sap2000, Revit, Bim360. Project: Layyah Combined Cycle Power Plant Location of project: UAE Location of work: Egypt Duties: making structural design for: • Fire Fighting tank, HRSK Storage support area foundation, trenches, duct banks and manholes. • air compressor building, emergency diesel generator foundation and pipes rack foundation. • central control building, secondary steel platforms foundation and water treatment building. • AutoCAD • SAP2000 • ommon electrical building, gas compressor electrical and GCB foundation. • fuel oil electrical building, gt oily drain pit foundation, fuel oil fence and Aux Transformers Foundation. • making structural BOQ for power plant to make a comparison between tender quantities and actual quantities and calculate the overrun in cost • structural bim models for cas compressor area building, power transformers, pipe racks support, common electrical building and control building by revit structural to check clashes and to export IFC model for overall power plant. Engineering Programs used: Autocad, Etaps, Safe, Sap2000, Revit Structural

Contact Mahmoud A. about your job

Log in to discuss any details over chat.

Portfolio

4646080
4646080

Reviews

Changes saved
No reviews to see here!

Contact Mahmoud A. about your job

Log in to discuss any details over chat.

Verifications

Preferred Freelancer
Identity Verified
Payment Verified
Phone Verified
Email Verified
Facebook Connected
Previous User Next User
Invite sent successfully!
Thanks! We’ve emailed you a link to claim your free credit.
Something went wrong while sending your email. Please try again.
Registered Users Total Jobs Posted
Freelancer ® is a registered Trademark of Freelancer Technology Pty Limited (ACN 142 189 759)
Copyright © 2024 Freelancer Technology Pty Limited (ACN 142 189 759)
Loading preview
Permission granted for Geolocation.
Your login session has expired and you have been logged out. Please log in again.